On Thursday 18th April, CEDESA – the Centre for Studies for the Economic and Social Development of Africa – presented its website on Public Works and Investments in Angola – https://obraspublicasinvestimentosangola.org/, with the dual aim of providing independent information to academics, journalists and interested parties in general on what is happening in Angola in this area, and to serve as a public information document for Angolan civil society on the evolution of major works in the country, through the creation of a participatory opening mechanism.
The presentation of the project was attended by members of the Angolan and Chinese Embassies in Portugal and the Angolan Consulate General in Lisbon, as well as various businesspeople, academics and journalists.
CEDESA is a non-profit organisation under private law dedicated to the study and research of political and economic issues in southern Africa, particularly Angola. It was born out of an initiative by several academics and experts from the Angola Research Network (ARN https://www.angolaresearchnetwork.org/) , with the main aim of providing rigorous analyses of the economic outlook for Angola and neighbouring countries to political decision-makers, the business community, academics, students and other interested parties.
https://www.cedesa.pt/wp-content/uploads/2024/05/obras-inv-angola.jpg12001600CEDESA-Editorhttps://www.cedesa.pt/wp-content/uploads/2020/01/logo-CEDESA-completo-W-curvas.svgCEDESA-Editor2024-05-02 15:48:582024-05-02 15:49:00CEDESA launches portal on Public Works and Investments in Angola
1-Introduction: characterization of the water catchment construction project on the Cunene River
It has been our concern to seek concrete answers to specific problems, in addition to the intense rhetoric in pre-election periods. In this case, one of the topics that interests us is the drought in southern Angola. As we mentioned in a report from last November[1], we follow the works in progress related to the Drought. One of them is almost ready to be inaugurated and operational. It is about that project we give an account in this document.
This report focuses on the execution of the Structuring Works to Combat Drought, specifically the design and construction of a catchment on the Cunene River and the construction of pipelines to the localities of Cuamato, Namacunde and Ndombondola.
This project has 2 Lots:
• LOT 1 – Design and Construction of Intake on the Cunene River, Pumping System, Pressurized Duct, Open Channel from Cafú to Cuamato and 10 Chimpacas (water reservoirs);
• LOT 2 – Design and Construction of Adductor Channel from Ombala – Cuamato to Ndombondola, Adductor Channel from Cuamato to Namacunde and 20 Chimpacas.
Regarding Lot 1, the General Contractor is SINOHYDRO Corporation Limited, a limited company incorporated in 2011 in Luanda whose property is held by Chinese companies. The supervision is carried out by the Consortium GWIC – Angola, S.A / SINTEC – Consultoria de Engenharia, Lda. As for Lot 2, the responsible entity is the same, except for inspection; in this case the responsible entity is TRIEDE Angola, Lda. A prestigious company from Portugal.
The deadline for the project conclusion points to the end of March 2022. Therefore, a very brief opening is expected.
The value of the two works reaches 140 million US dollars.
Fig. 1: Lots 1 and 2 of the Project (Cunene Province, Angola)
2- Projects explanation
Lot 1 comprises the water transfer works from the Cunene River, in the Cafu section, to the localities of Cuamato, and is based on the construction of the water intake, pumping station, pressurized pipelines, feeder channels and associated facilities.
The Project consists of the following main elements:
• Intake from the Cunene river bed, including the water intake structure, floodgates, grates and other associated equipment;
• Pumping Station with a capacity of 2 m3/s;
• The Pumping Station will be equipped with two active pumps and one backup pump in the first phase. The pumps will be turbine-type, vertical, with a nominal capacity of 1 m3/s;
• Gravity channel coated to receive 6 m3/s. The length of the channel is 46.54 kilometers with connection to the reservoir, considering the alignment that minimizes earth movements;
• A North-South alignment was established from Cafu to the Ombala-Io-Mungo region. In the end, the gravity channel will be divided into two branches, serving the localities of Namacunde and Ndombondola.
Fig. 2: General Conductor Channel | Manual cladding with concrete class C20/25, 35 km, 1 front km (45,954)
Fig. 3: Chimpacas | State of the Chimpaca
In turn, Lot 2 comprises the works of the following channels, which derive from the Bypass Structure (BS) of flows from the General Conductor Channel (GCC):
• West Conductor Channel – WCC (Cuamato / Ndombondola), with a length of around 53.04 kilometres;
• East Conductor Channel – ECC (Cuamato / Namacunde), with a length of about 53.11 kilometres.
Fig. 4: East Adductor Channel (EAC)
Fig. 5: Placing the fence on the Chimpacas of the East and West channels
3-Delays, advances and resources used
Due to several constraints that occurred in 2021, such as lack of diesel in the south of Angola, water for concrete production and respective curing, cement at work, and rainfall, the completion of the work slipped a little, since completion was initially scheduled for February. Now the completion date is for the end of March (maybe early April).
A total of 1250 workers (Lot 1 – 417; Lot 2 – 833) were assigned to the works, 162 (Lot 1 – 70; Lot 2 – 92) of Chinese nationality and 1088 (Lot 1 – 347; Lot 2 – 741) of Angolan nationality. Equipment is allocated to the works, in a total of 388 units, of which 135 in Lot 1 and 243 units in Lot 2.
4-Benefits for the population
The project, as presented above, consists of the construction of the water transfer system for the Cunene River, from the locality of Cafu to the Chanas region in the province of Cunene, in Angola. The interventions are included in a total investment of more than €140 million made by the government to deal with long periods of drought that dramatically affect people and animals.
The aim is to create the right conditions for the development of agriculture and livestock, increasing resilience to climate change in this practically deserted region of southern Angola, subject to frequent prolonged droughts, benefiting hundreds of thousands of inhabitants and livestock, as well as providing water for irrigation in an area estimated at 5,000 hectares.
The project is expected to benefit approximately 200,000 inhabitants and 250,000 head of cattle. It should be noted that Cunene has about 900 thousand inhabitants, therefore more than 20% of the population is covered by this work.
https://www.cedesa.pt/wp-content/uploads/2022/03/Rio-Cunene.jpg345640CEDESA-Editorhttps://www.cedesa.pt/wp-content/uploads/2020/01/logo-CEDESA-completo-W-curvas.svgCEDESA-Editor2022-04-03 11:00:002022-03-31 15:48:20Structural works to combat the effects of drought in southern Angola
We may request cookies to be set on your device. We use cookies to let us know when you visit our websites, how you interact with us, to enrich your user experience, and to customize your relationship with our website.
Click on the different category headings to find out more. You can also change some of your preferences. Note that blocking some types of cookies may impact your experience on our websites and the services we are able to offer.
Essential Website Cookies
These cookies are strictly necessary to provide you with services available through our website and to use some of its features.
Because these cookies are strictly necessary to deliver the website, refuseing them will have impact how our site functions. You always can block or delete cookies by changing your browser settings and force blocking all cookies on this website. But this will always prompt you to accept/refuse cookies when revisiting our site.
We fully respect if you want to refuse cookies but to avoid asking you again and again kindly allow us to store a cookie for that. You are free to opt out any time or opt in for other cookies to get a better experience. If you refuse cookies we will remove all set cookies in our domain.
We provide you with a list of stored cookies on your computer in our domain so you can check what we stored. Due to security reasons we are not able to show or modify cookies from other domains. You can check these in your browser security settings.
Other external services
We also use different external services like Google Webfonts, Google Maps, and external Video providers. Since these providers may collect personal data like your IP address we allow you to block them here. Please be aware that this might heavily reduce the functionality and appearance of our site. Changes will take effect once you reload the page.
Google Webfont Settings:
Google Map Settings:
Google reCaptcha Settings:
Vimeo and Youtube video embeds:
Privacy Policy
You can read about our cookies and privacy settings in detail on our Privacy Policy Page.